;
● Twa stik of trije stik
● Folsleine of Ferminderje Bore
●Trunnion Mounted Ball, Solid Ball
● Fire Safety Seat Sealing
●Anti-Statyske Spring Device
●Blow-out bewiis stem
●Low Emission
● Dûbele Blok en Bleed
1.Forged Body mei
2.Pressure relief fentyl om foar te kommen holte oer druk as fan tapassing
3.Emergency ynboude stem en stoel sealant ynjeksje systeem
4.DBB-ûntwerp makket it gebrûk fan in inkele fentyl mei twa selsstannich funksjonearjende sitten op elk ein fan 'e fentyl mooglik, wylst de holte tusken de sittende oerflakken kin wurde ventileare of bloed.
KLASSE 150/300 ONLY, OARE PRESSURE RATING PLEASE KONTAKT US.
KLASSE 150 | |||||||||||||||
DN | mm | 50 | 65 | 80 | 100 | 150 | 200 | 250 | 300 | 350 | 400 | 450 | 500 | 600 | 700 |
NPS | in | 2 | 21/2 | 3 | 4 | 6 | 8 | 10 | 12 | 14 | 16 | 18 | 20 | 24 | 28 |
L(RF) | mm | 178 | 191 | 203 | 229 | 394 | 457 | 533 | 610 | 686 | 762 | 864 | 914 | 1067 | 1245 |
in | 7 | 7.5 | 8 | 9 | 15.5 | 18 | 21 | 24 | 27 | 30 | 34 | 36 | 42 | 49 | |
L1(BW) | mm | 216 | 241 | 283 | 305 | 457 | 521 | 559 | 635 | 762 | 838 | 914 | 991 | 1143 | 1346 |
in | 8.5 | 9.5 | 11.13 | 12 | 18 | 20.5 | 22 | 25 | 30 | 33 | 36 | 39 | 45,5 | 53 | |
L2(RTJ) | mm | 191 | 203 | 216 | 241 | 406 | 470 | 546 | 622 | 699 | 775 | 876 | 927 | 1080 | |
in | 7.5 | 8 | 8.5 | 9.5 | 16 | 18.5 | 21.5 | 24.5 | 27.5 | 30.5 | 34.5 | 36,5 | 42.5 | ||
H | mm | 153 | 165 | 195 | 213 | 272 | 342 | 495 | 580 | 625 | 720 | 790 | 840 | 1050 | 1150 |
in | 6.05 | 6.5 | 7.68 | 8.39 | 10.7 | 13.5 | 19.5 | 22.85 | 24.6 | 28.35 | 31 | 33.1 | 41.34 | 45.3 | |
Do (W) | mm | 400 | 400 | 600 | 850 | 1100 | 1500 | *350 | *350 | *600 | *600 | *800 | *800 | *800 | *800 |
in | 15.74 | 15.74 | 23.62 | 33.46 | 43.3 | 59 | 13.8 | 13.8 | 23.6 | 23.6 | 31.5 | 31.5 | 31.5 | 31.5 | |
RF(Kg) | 15 | 19 | 38 | 65 | 97 | 160 | 240 | 390 | 510 | 750 | 895 | 1190 | 2100 | 3000 | |
Bw(Kg) | 13 | 17 | 35 | 55 | 92.8 | 154 | 227 | 365 | 478 | 711 | 868 | 1138 | 2015 | 2900 |
KLASSE 300 | |||||||||||||||
DN | mm | 50 | 65 | 80 | 100 | 150 | 200 | 250 | 300 | 350 | 400 | 450 | 500 | 600 | 700 |
NPS | in | 2 | 21/2 | 3 | 4 | 6 | 8 | 10 | 12 | 14 | 16 | 18 | 20 | 24 | 28 |
L(RF) | mm | 216 | 241 | 283 | 305 | 403 | 502 | 568 | 648 | 762 | 838 | 914 | 991 | 1143 | 1346 |
in | 8.5 | 9.5 | 11.13 | 12 | 15.88 | 19.75 | 22.38 | 25.5 | 30 | 33 | 36 | 39 | 45 | 53 | |
L1(BW) | mm | 216 | 241 | 283 | 305 | 457 | 521 | 559 | 635 | 762 | 838 | 914 | 991 | 1143 | 1346 |
in | 8.5 | 9.5 | 11.13 | 12 | 18 | 20.5 | 22 | 25 | 30 | 33 | 36 | 39 | 45 | 53 | |
L2(RTJ) | mm | 232 | 257 | 298 | 321 | 419 | 518 | 584 | 664 | 778 | 854 | 930 | 1010 | 1165 | 1372 |
in | 9.13 | 10.13 | 11.75 | 12.63 | 16.5 | 20.38 | 23 | 26.13 | 30.63 | 33.63 | 36.63 | 39.75 | 45.89 | 54 | |
H | mm | 153 | 165 | 195 | 213 | 272 | 342 | 495 | 580 | 625 | 720 | 790 | 840 | 1050 | 1150 |
in | 6.02 | 6.5 | 7.68 | 8.39 | 10.7 | 13.5 | 19.5 | 22.85 | 24.6 | 28.35 | 31 | 33.1 | 41.34 | 45.3 | |
Do (W) | mm | 400 | 400 | 600 | 850 | 11000 | 1500 | *350 | *350 | *600 | *600 | *800 | *800 | *800 | *800 |
in | 15.74 | 15.74 | 23.62 | 33.46 | 43.3 | 59 | 13.8 | 13.8 | 23.6 | 23.6 | 31.5 | 31.5 | 31.5 | 31.5 | |
RF(Kg) | 18 | 27 | 47 | 80 | 118 | 200 | 365 | 530 | 740 | 1030 | 1320 | 1540 | 2600 | 3900 | |
Bw(Kg) | 14 | 22 | 38 | 65 | 105 | 185 | 342 | 503 | 713 | 1000 | 1285 | 1498 | 2540 | 3825 |
Ynspeksje proseduere foar 3-Piece Trunnion Mounted Ball Valve
● Gemyske analyze
1. Hânlieding Metoaden 2.PMI
●Mechanyske prestaasjes
1. Tensile Strength 2. Yield Strength 3. Charpy impact Test
● Valve dikte test
Ultrasone diktemeter
● Dimension en Roughness Test
Caliper / Digitale Caliper / Thread Gauge ensfh
●Hardness Test
Hardheid Guage
● Welding Proseduere kwalifikaasje
●NDT Test (MT,PT,UT,RT)
● Torque Test
● Druk Test
● Painting Ynspeksje
● Finale ynspeksje (naamplaat, fisuele uterlik ...)
Betellingstermyn | L/C, T/T, Western Union, Paypal |
Levertiid | 15 - 30 dagen nei betelling |
Seaport | Shanghai Of Ningbo Sina |
De 3rdYnspeksje | Beskikber |
Foarbyld | Beskikber foar 3-Piece Trunnion Mounted Ball Valve |
Garânsjeperioade | 18 moannen nei shipments en 12 moannen nei ynstallearre |
Valve Test | 100% kwantiteit hifke foar levering |
Packing | Triplex Case foar 3-Piece Trunnion Mounted Ball Valve |
MOQ | 1 Pc foar 3-Piece Trunnion Mounted Ball Valve |
Nammeplaat | Neffens klant foar 3-Piece Trunnion Mounted Ball Valve |
Kleur | Neffens klant foar 3-Piece Trunnion Mounted Ball Valve |
Ferstjoering | By see, By Air, By Express, en doar ta doar beskikber |
OEM / ODM Service | Beskikber |
Foar hast 10 jier hat RXVAL him kontinu ynset om de bêste 3-Piece Trunnion Mounted Ball Valve-produkten oan te bieden om te foldwaan oan in breed oanbod fan tapassingen en easken.
As klepfabrikant hat RXVAL jo perfekte 3-delige Trunnion Mounted Ball Valve-oplossing.Us súkses yn 'e kleppensektor wurdt taskreaun oan ús klant-sintraal team fan ferkeappersoniel, yngenieurs, arbeiders en personiel nei tsjinst dy't kollektyf ynsette foar it leverjen fan kwaliteitsprodukten tsjin in priis dy't jo soene ferwachtsje.